LEC were appointed as a nominated contractor to carry out a number of refurbishment projects nationwide to the new Body Shop Pulse boutique design concept programme. The scope of works consisted of minor and major alterations to existing high street and shopping centre stores to meet the new design layout.
Works required were new mains distribution equipment, lighting, emergency lighting, power, fire alarm, ventilation, heating, data and telephone cabling requirements. All works to each store had to be completed within two weeks which involved new flooring, ceilings, partition walls, perimeter
fixtures, air conditioning, decoration etc. whereby all trades had to work closely with each other to meet the programme deadline.